Hard & soft cost benchmarks — Miami-Dade, Broward, Palm Beach
| Asset type | $/SF (hard costs) | Key cost drivers | South FL premium factors | Source |
|---|---|---|---|---|
| Residential — vertical, ex-land | ||||
| RESBuilder-grade | $180 – $280 | Standard finishes, production materials, limited floor plans | Impact windows mandatory; labor premium +10–15% vs. state average | HomeGuide 2026 ↗ |
| RESCustom mid-range | $280 – $450 | Granite/quartz, hardwood, upgraded MEP, custom layouts | Coastal engineering surcharge; pile/elevated foundations in flood zones | CoreExec 2026 ↗ |
| RESLuxury / high-end | $500 – $800 | Custom millwork, smart systems, designer finishes, bespoke architecture | Hurricane/wind engineering; luxury board approvals; extended permitting | HCD Group 2026 ↗ |
| RESUltra-luxury / waterfront | $800 – $1,000+ | Imported materials, structural complexity, estates with multi-structures | VE/AE FEMA zones; dock/marine structures; master planning requirements | PA Architect 2026 ↗ |
| Multifamily | ||||
| MF3-story wood frame | $300 – $350 | Wood frame construction, standard unit mix, surface parking | Hard costs ≈ 37% of TDC; soft costs ≈ 24%; land ≈ 19% | Mountain Cove 2025 ↗ |
| MFMid-rise (≈10 stories) | $474 – $569 | Concrete/steel podium, structured parking, MEP complexity | Total project: $12.9M–$18.3M; wind-load and coastal engineering | Autodesk / Gordian 2025 ↗ |
| MFHigh-rise tower | $545 – $654 | Structural steel, curtain wall, fire suppression, elevator banks | Coastal setbacks, wind tunnel analysis, extended permitting timeline | Autodesk / Gordian 2025 ↗ |
| Commercial / hospitality | ||||
| COMSingle-story commercial | $238 – $286 | Office/retail shell, basic systems, surface parking | Miami-Dade code premium; impact glazing requirement | Autodesk / Gordian 2025 ↗ |
| COM3-star hotel | $371 – $478 | Guest rooms, F&B shell, back-of-house, pool | ADA compliance, life-safety systems, wind engineering | Autodesk / Gordian 2025 ↗ |
| COM5-star / luxury hotel | $600 – $683+ | High-spec finishes, F&B buildout, spa, amenities, full FF&E scope | Branded standards add 15–25% cost; coastal engineering; LEED/certifications | Autodesk / Gordian 2025 ↗ |
| Line item | Typical range | South FL context | Source |
|---|---|---|---|
| Design & professional fees | |||
| A&EArchitecture | 8% – 15% of hard costs | Higher end for waterfront conditions, complex coastal detailing, multi-structure estates | PA Architect 2026 ↗ |
| A&EEngineering (structural, MEP, civil) | 2% – 5% of hard costs | Wind-load and flood-zone engineering required; Miami-Dade has among the strictest standards nationally | PA Architect 2026 ↗ |
| TOTALAll soft costs — luxury residential | 18% – 30% of hard costs | Full design team, permitting, consulting, financing fees; South FL range per practitioner data | PA Architect 2026 ↗ |
| TOTALAll soft costs — multifamily | ~24% of TDC | Florida multifamily industry benchmark; includes A&E, financing, legal, and all fees | Mountain Cove 2025 ↗ |
| Permits, fees & regulatory | |||
| Building permits (residential) | $5,000 – $10,000+ | Scales with project size and complexity; Miami-Dade permitting is among the most layered in the state | Seanote Construction 2025 ↗ |
| Impact fees | Varies by county | School, fire, parks, transportation, water/sewer charges — assessed at permit issuance; budget $10K–$30K+ per unit for multifamily | County fee schedules |
| Survey & legal | $1,500 – $5,000 | Boundary survey, title work, easement review; waterfront/coastal adds complexity and cost | Industry standard |
| Financing & development costs | |||
| Loan origination / financing fees | 1% – 3% of loan | Construction loan carry costs remain elevated in 2025–2026 interest rate environment | Industry standard |
| Developer fee | 3% – 5% of TDC | Standard for ground-up development; institutional projects may negotiate lower; sometimes deferred to completion | Industry standard |
| Builder's risk insurance | 1% – 2% of hard costs / yr | Hurricane exposure drives South FL premiums significantly higher than national average; budget conservatively | Industry standard |
| Property taxes during construction | Budget separately | Carries from land acquisition through CO; mill rate varies by county and municipality | Industry standard |
| Marketing, sales & pre-opening | |||
| Marketing & sales (condo / resi) | 2% – 6% of projected revenue | Higher for branded luxury product; model unit buildout, broker co-op, and digital campaigns are separate sub-lines | Industry standard |
| FF&E (luxury / hotel / branded residences) | Project-specific | Can equal or exceed hard costs for ultra-luxury; branded residences have brand-mandated FF&E standards | Industry standard |
rsmeansonline.com ↗ — Paid subscription, 30-day free trial
85,000+ unit prices, 25,000 building assemblies, 42,000+ repair/remodel costs. Localizable to Miami, Fort Lauderdale, or West Palm Beach via City Cost Index. The industry standard for underwriting, pro forma validation, and GC bid review.
turnerconstruction.com/cost-index ↗ — Free, published quarterly
80-year non-residential cost index. Q4 2025 = 1510, up +4.72% YoY. Turner has a dedicated South FL office covering Miami-Dade, Broward, and Palm Beach. Best for escalation narrative in investment memos.
Autodesk Construction Cloud ↗ — Published benchmark
$/SF benchmarks by building type for Southern US markets including Miami. Covers single-story, mid-rise, high-rise, hotels, retail, and schools. Good for early-stage feasibility before a full RSMeans pull.
Miami-Dade, Broward, Palm Beach county websites — Free public access
Exact permit fee schedules, impact fee tables by land use, and flood zone maps (FEMA FIRM). Essential for accurate soft cost budgeting. Miami-Dade's online permit search lets you verify fees on comparable projects.
msc.fema.gov ↗ — Free
Flood Insurance Rate Maps (FIRM) for every South FL parcel. Critical for foundation type, elevation certificate requirements, and flood insurance budgeting. Most coastal South FL land falls in Zone AE or VE.
rsmeans.com ↗ — Free quarterly updates with book purchase
Quarterly updates: Jan 2025 = 293.9, Apr = 295.8, Jul = 300.7, Oct = 304.2. Escalate any historical estimate to current market pricing. Useful for litigation support and insurance replacement cost analysis.